Engineered for Performance, Built to Last
Project Equipment
Equipment Overview
This project integrates modern, efficient, and long-lifespan systems designed for high availability and optimal energy performance:
- Wind Turbines: 3 × Nordex N133/4.8 turbines, each producing 4.8 MW (total: 14.4 MW). Rated for 25-year lifespan and certified for high-wind zones.
- Battery Storage: 6 × BYD 2.5 MWh BESS containers (total: 15 MWh), designed for 4-hour discharge. Optimized for peak shaving and grid support.
- Data Center: 5 × Vertiv Tier III modular units totaling 5 MW IT capacity. High-efficiency cooling, power redundancy, and remote monitoring enabled.
All equipment sourced from Tier 1 vendors with global technical support and certified performance guarantees.

Technology Partners
We’ve selected globally recognized partners to ensure quality, scalability, and long-term serviceability:

Nordex
Renowned for high-performance wind turbines engineered for complex terrain and high-wind zones

BYD
A global leader in battery technology with a track record in utility-scale BESS solutions

Vertiv
A trusted provider of modular, secure, and high-efficiency data center infrastructure for hyperscale and edge deployments